Hi guys, anyone knows how to resolve the wrong values of the “Date Modified” field on my WebDav folder which is linked to a document library on my sharepoint 2013 site? I’ve been diagnosing the problem but still have no idea how to resolve it, the values do not match [WebDav Issue] help please 🙂
Thank you guys for ur reply, but really the problem is bigger than that
check this to understand more the problem:
Still waiting for help
Hi, Can you please check the Regional Settings. Thanks
Hi, Nasreddine.
The dates actually represents two different things.
The Modified date in the SharePoint library is when the list entry last got modified. On the other hand, the modified date in the webdav folder reflects when the actual file was last modified. This results in different dates in the library as opposed to the webdav folder.